Duration: (39) ?Subscribe5835 2025-02-11T20:48:22+00:00
MJB A2 RAFT STEEL LAYING BINDING
(1:1econd)
MJB A2 RAFT day 8
(16)
MJB A2 STEEL LAYING f1a @16mm spacing 160mm C/C outer side \u0026 f1 @20mm 80c/c inner side
(39)
MJB A2 raft steel binding
Day -5 MJB A2 CHAIR BAR PLACEING
(15)
DAY -4 MJB A2 RAFT STEEL LAYING BINDING WORK IN PROGRESS
(1:)
DAY -2 MJB A2 RAFT STEEL LAYING F2 @12MM 110C/C INNER FACE \u0026 F2A @10MM 110C/C OUTER FACE
(1:48)
MJB DAY 6 -DAY 8 A2 RAFT STEEL LAYING \u0026 BINDING F3A @25MM \u0026 F3 @32MM 160MM C/C WITH BINDER F4 @16mm
(3:1econd)
MJB Sati River bridge, Geotech boring Machine reached at A2 side for strata confirmation.
(32)
MJB DAY Y -DAY 8 A2 RAFT STEEL LAYING \u0026 BINDING F3A 25MM \u0026F3 32MM 160MM C/C WITH BINDER F416MM
(2:19)
MJB A2 STEEL LAYING F1 @20MM 80MMC/C \u0026 F1A @16MM 160MMC/C DAY -1
(2:20)
❰ MJB ARMA ❱
(2:38)
Not Gon' Cry
(4:53)
MJB RAFT A2 DAY -3 STEEL LAYING \u0026 BINDING F2@12MM 110C/C \u0026F2A @10MM 110C/C WITH SIDE STELL BINDING
(1:18)
Day-5 MJB RAFT A2 CHAIR BAR PLACING F3A @25MM 160MM C/C FROM ONE SIDE TO ANTOHER SIDE
(1:3)